Mortgages on non-standard construction homes
A non-standard construction home in the UK is one not built with the usual brick or block cavity walls and a tiled or slate roof, such as concrete, steel frame or some timber frame homes. Many can still get a mortgage, but from fewer lenders. The exact construction type and its repair history decide the answer, so find out what the home is built from before you pay for a valuation.
What counts as non-standard
Lenders think of a standard home as brick or block cavity walls with a tiled or slate roof. Anything else may be treated as non-standard, and each lender keeps its own list. These are the types that come up most often:
- Concrete homes. Precast reinforced concrete (PRC), which is concrete panels or posts made in a factory and put together on site, plus poured concrete and concrete block systems.
- Steel frame. A steel structure clad in brick, render or panels. Lenders often treat older steel frame homes more strictly than newer ones.
- Timber frame. A modern timber frame with a brick or block outer wall is often treated as standard. Older timber frame, or timber clad on the outside, is more likely to be a problem.
- Prefab and system-built homes. Homes made from factory-built panels or sections. Newer factory-built homes are sometimes called modern methods of construction.
- Other walls and roofs. Cob (earth walls), thatched roofs, and flat or felt roofs over much of the home. Some lenders accept these as standard; others treat them as non-standard.
- Mundic. Some older concrete in the south west of England, covered further down.
How we put this list together: from lenders' published property criteria we have read. Lenders list these types differently, so treat it as a guide to the kinds of homes that get asked about, not as any one lender's rules.
Why lenders worry
A lender is lending against the home. If you can't pay, it needs to sell the home for enough to clear the loan. Some construction types have known defects or can be expensive to repair, so lenders either avoid them, lend less against them, or want proof the home is in good order.
For some concrete homes the problem is set down in law. Under the Housing Act 1985, the Secretary of State can designate a class of buildings as defective where they are defective because of their design or construction and, once that became generally known, the value of some or all of the homes fell substantially (Housing Act 1985, section 528). The designation describes what is wrong with that class of building, and notice of it is published in the London Gazette (same section). These homes are usually called designated defective.
The other worry is resale. A home fewer lenders will accept has fewer buyers who can get a mortgage on it. We'd expect that to show in the price and in how long it takes to sell, though we haven't found a published figure that measures it.
The surveys and reports lenders ask for
The lender's valuer looks at the home first. If the construction is unusual, the valuer may ask for more before the lender decides. In the lender criteria we have read, these are the reports that come up most:
- A structural engineer's report, often for steel frame homes, saying the frame is sound.
- A repair certificate for a repaired PRC home, showing it was repaired to an approved scheme. Some lenders accept a certificate issued after the repair, if a qualified professional prepares it in the form they ask for.
- A mundic test on concrete homes in parts of the south west of England.
- The exact name of the construction system. Many system-built homes carry a maker's name, and the same lender can treat two similar-sounding systems differently.
Who pays depends on the lender and the report, and in practice the buyer often does (our understanding from how these reports are usually arranged; no lender we read sets this out for every case).
Your own survey is a separate thing. RICS says a mortgage valuation is a limited check for the benefit of the lender, not the buyer, and that costly problems may not appear in it (RICS consumer guide, home surveys). For a building that is unusual or altered, RICS suggests its Level 3 Home Survey, the most detailed of its three levels (same guide). It also says a survey is particularly useful where the home is old or unusual, or has a timber frame or a thatched roof (same guide).
Mundic in the south west of England
Mundic is a problem with some older concrete in the south west of England. RICS publishes guidance for surveyors on it, and says it sets out how to classify concrete samples "to help lenders distinguish between those properties accepted as mortgageable and those that are not" (RICS, The mundic problem). The current third edition replaced the second from 1 January 2016 (same page). If you're buying an older home in the south west of England, ask early whether a mundic test is needed.
Your options
- Find out the construction type first. The seller, the estate agent, an older survey or the local council (for former council homes) may know it. Without the name, a lender can't check it against its list.
- Check whether it's been repaired. For a PRC home, ask the seller for the repair certificate. In the lender criteria we have read, a designated defective home that hasn't been repaired is generally not accepted.
- Expect a bigger deposit or a smaller choice. Some lenders lend less against non-standard homes, or only offer certain products on them. Others won't lend at all.
- Look beyond the high street. Lenders' property rules differ a lot, so a home one lender turns down may suit another, including smaller building societies and specialist lenders. Their rates can be higher.
- Think about selling later. The same limits will apply to your buyer.
A broker who knows lenders' property criteria can check the construction type before you pay for a valuation. Brokers can charge a fee or be paid by the lender, so ask how they're paid before you start. This page is information, not advice.
Common questions
What is a non-standard construction house?
A home built in a way other than the usual brick or block cavity walls with a tiled or slate roof. Common examples are concrete homes such as precast reinforced concrete (PRC), steel frame, some timber frame, prefabricated or system-built homes, and homes with unusual roofs such as thatch. Lenders do not all draw the line in the same place.
Can I get a mortgage on a non-standard construction home?
Often, yes, but from fewer lenders, and the answer depends on the exact construction type, its age and its condition. Some types that a lender has listed as defective are only accepted once repaired, and some are not accepted at all.
What does designated defective mean?
Under section 528 of the Housing Act 1985, the Secretary of State can designate a class of buildings as defective where they are defective because of their design or construction and, once that became generally known, the value of some or all of the homes fell substantially. Notice of a designation is published in the London Gazette. (legislation.gov.uk, Housing Act 1985 s528)
Which survey should I get?
RICS suggests its Level 3 Home Survey, its most detailed, for a building that is unusual or altered, or for a large, older or run-down home. It says a survey is particularly useful where a property is old or unusual, or has a timber frame or a thatched roof. (RICS consumer guide, home surveys)
Is the lender's valuation enough?
No. RICS says a mortgage valuation is a limited check for the benefit of the lender, not the buyer, and problems that would be costly to put right may not appear in it. (RICS consumer guide, home surveys)
What is mundic?
Mundic is a problem with some older concrete in the south west of England. RICS publishes guidance for surveyors there that sets out how to classify concrete samples, to help lenders tell apart homes accepted as mortgageable and those that are not. (RICS, The mundic problem)
See also spray foam insulation and mortgages, mortgage underwriting, will my mortgage offer be withdrawn? and the house viewing checklist.